Change Log
A change to a system, policy, or process should be recorded, reviewed, and, if it goes wrong, rolled back. The Change Log is that record: a request-to-implementation trail for change management.
The Change Log is included in Premium and Enterprise, and it works during
the demo too.
A change request
Each entry has a title, a type (system, policy, process, infrastructure, personnel, vendor, other), the system affected, a description, a risk level, and a change date. Flag sensitive data impact when the change touches personal or confidential data, and capture a rollback plan and test results where they apply.
The workflow
A request moves through clear states, each set by an explicit action:
- Planned — the request as filed.
- Approved — an admin signs off (the approver and time are stamped).
- Implemented — the change is live (time stamped).
- Rolled back or Rejected — end states for changes that were reversed or declined.
The list summarizes what's planned, what's approved but not yet implemented, and what was implemented this month.
Who can do what
Org admins create change requests and drive them through approval, implementation, and rollback. Everyone else views the log read-only.