Risk register
The Risk Register is included in Premium and Enterprise, and it works on
the Free plan too. Exporting it comes with a paid plan.
The risk register is one ledger of your organization's risks: the ways your AI systems could fail or cause harm and, while a HIPAA assessment is offered, the risks to the electronic protected health information (ePHI) you hold. Each risk names:
- its category, from the vocabulary of its program:
- for an AI risk, the trustworthy characteristic it threatens, from the NIST AI Risk Management Framework: valid and reliable; safe; secure and resilient; accountable and transparent; explainable and interpretable; privacy-enhanced; fair, with harmful bias managed;
- for a HIPAA risk (offered while a HIPAA assessment is): to ePHI, the **HIPAA Security Rule section** it falls under: administrative (45 CFR § 164.308), physical (§ 164.310), technical (§ 164.312), organizational requirements (§ 164.314), or policies, procedures and documentation (§ 164.316); or, for a risk to protected health information in any form (paper included), the **Privacy Rule safeguards** (§ 164.530(c)), which the Security Rule sections do not reach. A HIPAA risk may name any system that handles ePHI, and takes no generative AI risk;
- for a risk about a generative system or model, the generative AI risk from NIST AI 600-1 (for example confabulation, information security, value chain). It is accepted only when the system or model the risk is about is generative; on any other risk the save is refused and asks you to link one or clear it;
- the AI system and model it is about, or neither for an organization-wide risk such as a policy gap. A risk that names only a model is about that model, not the organization;
- an inherent rating, likelihood × impact (1–25), before treatment, and a residual rating after it. The residual rating is what the owner judges once the treatment is in place: give both residual values or neither, and a risk with none is shown as not rated, never as low;
- the framework controls that treat it (at most 30), and a treatment decision.
Filter the register by AI governance risks or HIPAA risks, or by one category; the export takes the same filters.
Only organization administrators create and edit risks. Contributors see the register and the risks on each AI system's page.
An administrator can also tick several risks on the register and, from the bar that appears, assign their owner, set their status or set their due date in one step. Each risk changes as it would on its own page: a status change is recorded in its history, and the bar says which risks changed and which already had that value.
Treatments
- Mitigate — reduce the risk with controls.
- Accept — acknowledge and tolerate it (document why).
- Transfer — shift it (e.g. insurance, a vendor).
- Avoid — stop the activity that creates it.
From risk to action
When you set a risk to Mitigate, you can have Backsplice generate a tracked remediation task automatically. Its priority is set from the risk score, and it links back to the risk so the work is visible from both sides. A risk can also be linked to the finding that surfaced it.
Treatment SLAs
Give a risk a due date and Backsplice tracks the treatment SLA. The register flags risks that are due soon (within a week) or overdue (with how many days past). Once an open or in-treatment risk passes its due date, the risk owner is escalated automatically (falling back to org admins) — at most once a week, so overdue work surfaces without becoming noise. Closing the risk or moving the due date stops the escalation.
Portfolio view
Portfolio view shows the open and in-treatment risks on two likelihood × impact grids, inherent beside residual, narrowed to one AI system or one risk tier if you choose. It lists the systems by risk tier, highest tier first, and within a tier by their highest current risk (residual where stated, inherent otherwise). Risks with no residual rating are counted beside the residual grid rather than drawn on it, and organization-wide risks are counted separately. An AI system's own page lists the risks about it.
The heatmap on the register itself is different: it plots the inherent rating of every risk, closed ones included.
Sorting the list
Click a column header to sort the register by that column; click again to reverse it. The sort is applied on the server, so it orders the whole register — not just the rows on the current page — and it is kept when you page through the results or change a filter. The active column shows an arrow, and screen readers announce it through the header's aria-sort state. Twelve of the fifteen register lists sort on the server this way; the evidence, remediation and vendor lists still sort the rows currently displayed.